Answer

Apr 30, 2025 - 01:32 AM
To install the PINEGREEN LIGHTING CL-4SL7003-TP 44 Inch 7000 Lumen Treadplate Shop Light, please follow the pre-installation and product installation instructions provided in the manual.
Pre-installation instructions:
1. Select your desired location for installation.
2. Measure the distance between the two "S Hook" attachment holes on top of the light to determine the distance between each hanging chain.
3. Determine your mounting method based on whether you are mounting into wood or drywall.
- For wood mounting, use xxxx Hooks (C) as shown in Diagram 1.
- For drywall mounting, use xxxx Hooks (C) and Anchors (D) as shown in Diagram 2.
Product installation instructions:
1. Attach the "S Hook" (A) to the LED light on both sides (Diagram A).
2. Attach the "Hanging Chain" (B) to the "S Hook" (A) on both sides (Diagram B).
3. Hang the Hanging Chain on the preinstalled " xxxx Hook" (C) and adjust to the desired height, ensuring the product is level.
4. If you want to link multiple units, you can connect up to 6 units by plugging the power cord directly into the adjacent unit(s).
5. Plug the main light's AC power cord into an AC outlet.
6. Use the chain to power the product ON and OFF.
If you have any questions or encounter any issues during installation, please contact our customer care at 1-888-745-4837.
Add New Comment