To install the BLUETTI AC500+B300S Modular Solar Power Station backup system, it is recommended to hire a licensed electrician. Improper installation can result in serious injury or property damage. Here are the general steps for installation:
1. For a 120 Volts AC500+B300S Backup System:
- Obtain the necessary accessories, including a transfer switch (Reliance TRK0505BR), a NEMA 14-50P to SS2-50R cord, and an AC charging cable.
- Follow the provided diagram for proper installation.
- Ensure that a licensed electrician performs the installation.
- Before plugging in your household appliances, check the voltage at the outlets.
2. For a 240 Volts AC500+B300S Backup System:
- Pair two sets of AC500+B300S together to create a 240V Split Phase System.
- In addition to two sets of AC500+B300S, you will need a transfer switch (Reliance TRK0505BR), an AC500 split-phase output cable, a NEMA 14-50 socket, and an AC500 split-phase AC charging cable.
- Create an emergency energy plan that outlines the appliances you need during a power outage.
- Connect the AC500+B300S sets to the transfer switch using the AC500 split-phase output cable.
- Connect the two AC500 units via the communication cable.
- Set the machine type to "Split phase" for both sets.
- Ensure that a licensed electrician performs the installation.
- Check the voltage at the outlets before plugging in your household appliances.
Please note that these are general installation guidelines, and it is important to refer to the specific instructions provided by Reliance PRO/TRAN2 for the actual wiring diagram. Additionally, always consult a licensed electrician for detailed guidance and to ensure a safe and proper installation.