To install the NEMO ELLISSE Double, Double MEGA pendant light, follow these steps:
1. Check the position of the numbers (1,2,3,4,5, and 6) inside the canopy. Make sure they are aligned correctly.
2. Check the number on the wire locks. Ensure that they correspond to the numbers inside the canopy.
3. Adjust the orientation of the Ellisse pendant light as desired.
4. Connect the wire locks to the corresponding numbers inside the canopy. The A-Minor (small) wire lock should be connected to the corresponding A-number inside the canopy, and the B-Major (big) wire lock should be connected to the corresponding B-number inside the canopy.
5. Adjust the cable length for tilting the pendant light if needed.
6. Lock the cable in place. For the A-Minor (small) wire lock, tighten it completely. For the B-Major (big) wire lock, lock it securely.
7. Make the electrical connections. Connect the lamp to a 24V power source for lamp connection. For 110V or 230V connection, follow the appropriate wiring instructions. If you want to use dimming, make the necessary connections for 1-10V dimming.
8. Close the canopy of the pendant light.
Please note that safety is guaranteed only if the installation is carried out by a qualified electrician. Make sure to disconnect the power before proceeding with the installation. Refer to the enclosed sheet for symbols and guarantees of the fixture.
Add New Comment