Answer
Apr 19, 2025 - 02:26 AM
To install the QAZQA H 125 mm Drum CL LED Ceiling Lamp, please follow these steps:
1. Ensure that the electrical supply is switched off before starting the installation process. It is recommended to switch off the power at the distribution box.
2. The installation of the luminaire should be done by authorized and qualified technicians according to the valid regulations for electrical installation.
3. Take note of the minimal separation distance from other objects and the required room around the fitting.
4. The luminaire should not be installed during rain or in areas where direct contact with water is possible.
5. Clean the luminaire with a clean, dry cloth or brush. Do not use solvents or abrasives. Avoid dampness on all electrical components.
6. If you are unsure about the installation process or have any doubts, it is recommended to consult a professional, taking local installation requirements into account. Some countries may require lighting to be installed only by registered installers.
Please refer to the instruction manual provided with the product for more detailed installation instructions and safety precautions.
User Manual Q&A

Add New Comment