To install the Oventrop HydroCom V Double Regulating and Commissioning Valve, please follow the steps below:
1. Ensure that the installation is carried out by suitably qualified specialist tradespeople.
2. The HydroCom V valve is designed to be installed in the risers of hot water central heating systems and cooling systems. It is used for hydronic balancing of the risers among each other.
3. The HydroCom V valve should be fitted into the pipe according to the instructions provided in the operating manual. You can find the detailed installation instructions on the Oventrop website at www.oventrop.com/qr/1062704.
4. xxxx the double regulating and commissioning valve tightly onto the pipe.
Please note that any use beyond the intended purpose or different from the instructions provided is considered improper use.
If you have any further questions or need assistance with the installation process, it is recommended to contact Oventrop's technical customer service at +49 (0) 29 62 82-234. They will be able to provide you with additional guidance and support.