Answer

Apr 12, 2025 - 08:35 AM
To install the TERMA WGROT108052 Rolo Towel Rail with the mounting bracket CKF 4x, please follow the step-by-step instructions below:
1. Start by selecting a suitable location for the towel rail. Ensure that it is close to a power source or within reach of the central heating system, depending on the version you have (water or dual fuel).
2. Once you have chosen the location, mark the positions of the mounting brackets on the wall. The TERMA WGROT108052 Rolo Towel Rail comes with four mounting brackets, CKF 4x.
3. Use appropriate tools to drill holes into the wall at the marked positions. Make sure the holes are deep enough to securely hold the mounting brackets.
4. Insert the provided wall plugs into the drilled holes.
5. Attach the mounting brackets to the wall by aligning them with the drilled holes and xxxx them in using the screws provided.
6. Once the mounting brackets are securely attached to the wall, you can now mount the TERMA WGROT108052 Rolo Towel Rail onto the brackets. The towel rail should easily slide onto the brackets.
7. Ensure that the towel rail is level by using a spirit level. Adjust the position if necessary.
8. If you have the water version of the towel rail, you will need to connect it to the central heating system. Please refer to the specific instructions provided in the user manual for this process.
9. If you have the dual fuel version, you will need to connect it to both the central heating system and an electrical power source. Again, refer to the user manual for detailed instructions on this process.
10. Once the towel rail is securely mounted and connected, you can turn on the central heating system or electrical power to start using it.
Please note that the above instructions are a general guide. It is always recommended to refer to the TERMA WGROT108052 Rolo Towel Rail user manual for specific instructions and safety guidelines related to your particular model.
Add New Comment