Installation of the Danfoss PSU STEP3-PS-1AC-24DC-2.5-PT Power Supply Unit can be done by following these steps:
1. Ensure that the power supply unit is disconnected from the mains power source before starting the installation process.
2. Identify a suitable location for the power supply unit. It should be installed in a dry and well-ventilated area, away from direct sunlight, excessive heat, or corrosive substances.
3. Mount the power supply unit securely using the provided mounting holes. Ensure that the unit is properly aligned and fixed to prevent any movement or vibration.
4. Connect the input power to the power supply unit. The PSU STEP3-PS-1AC-24DC-2.5-PT is designed to accept an input voltage of 1AC 100-240V, 50/60Hz. Make sure to follow the correct wiring connections as indicated in the user manual.
5. Connect the output load to the power supply unit. The PSU STEP3-PS-1AC-24DC-2.5-PT provides a 24V DC output with a maximum current of 2.5A. Ensure that the load is properly connected and within the specified limits of the power supply unit.
6. Double-check all the connections to ensure they are secure and properly insulated.
7. Once the installation is complete, reconnect the power supply unit to the mains power source.
Please note that the above instructions are a general guideline for installation. It is highly recommended to refer to the specific user guide provided by Danfoss for the PSU STEP3-PS-1AC-24DC-2.5-PT Power Supply Unit for detailed and accurate installation instructions.