To install the QAZQA 103273 Spira HL Black 4 luminaire, please follow the instructions provided in the manual. Here is a step-by-step guide:
1. Before starting the installation, make sure to read the instruction manual and familiarize yourself with the safety directions.
2. The luminaires should only be installed by authorized and qualified technicians according to the valid regulations for electrical installation.
3. Prior to installation, ensure that the electrical supply is switched off, preferably by using a switch in the distribution box.
4. Take note of the minimal separation distance from other objects and the required room around the fitting.
5. Exterior lighting should not be installed during rain.
6. When connecting wires, pay attention to the symbols provided in the manual. The symbols represent the following:
- N = Neutral
- L = Live
- Earth
7. Clamping screws in electrical connections must be adequately tightened, especially with 12V low voltage conductors.
8. Once the luminaire is installed, maintenance should be limited to the surfaces only. During maintenance, ensure that no moisture comes into contact with any areas of the terminal connections or voltage control parts.
9. When replacing a halogen lamp, wait for it to cool down for a minimum of 5 minutes.
10. To clean the luminaire, use a clean, dry cloth or brush. Avoid using solvents or abrasives, and make sure to keep all electrical components dry.
11. If you have any doubts or questions during the installation process, it is recommended to consult a professional, taking into account local installation requirements. Some countries may require lighting to be installed only by registered installers.
For further reference and detailed instructions, please refer to the instruction manual provided with the product.