To install the BLUE SEA SYSTEMS M2 OLED Digital Bilge Meter, follow these steps:
1. Choose the mounting style and location for the meter.
2. Turn off the AC power.
3. Prepare the mounting hole using the provided cutout templates.
4. Install the provided 150A/50mA Current Transformer according to the wiring diagram.
5. Make all necessary connections to the meter's connector. Refer to the Connector Pin Assignment Table for proper wiring.
6. Do not insert fuses into the fuse holders at this time.
7. Plug the wired terminal block into the meter.
8. Insert fuses into the fuse holders, making sure to insert the fuse to Pin 2 (DC Supply) last.
9. Turn on the AC power.
For more detailed information and setup options, refer to the online manual available at bluesea.com/products/1836.
Please note that if you are not knowledgeable about electrical systems, it is recommended to have an electrical professional install the unit. Additionally, ensure that no other DC or AC sources are connected to the vessel's wiring before installing the unit. The back of the unit is not waterproof, so avoid installing it where the back of the monitor is exposed to water.
The BLUE SEA SYSTEMS M2 OLED Digital Bilge Meter comes with a 5-year manufacturer's warranty. This warranty covers defects in materials or workmanship for 5 years from the date of first purchase. However, it does not cover costs associated with labor or shipping of the defective parts. It is important to use the meter according to the provided instructions to avoid any damage that may void the warranty.