Answer

Apr 09, 2025 - 01:55 AM
To adjust the door alignment and level the U-LINE UHBD524-IG01A 24 Inch Dual Zone Beverage Center, follow these steps:
1. Open the door and remove the gasket near the hinges.
2. Using a T-25 Torx bit, loosen each pair of Torx head screws on both the upper and lower hinge plates.
3. Square and align the door as necessary.
4. Tighten the Torx head screws on the hinge.
5. Reinstall the gasket into the channel starting at the corner.
If you need to reverse the door, follow these additional steps:
1. Open the door.
2. Using a T-25 Torx bit, loosen xxxx #1 and remove xxxx #2 on the top and bottom hinge. Slide and remove the door from the unit. Note: One hinge includes a metal spacer. The spacer must be used with that hinge when reversing the door.
3. Remove the caps from the xxxx heads on the opposite side (2 on top and 2 on the bottom). Using a #2 Phillips bit, remove the 4 underlying screws. Reinstall the screws and caps on the opposite side.
4. Partially install xxxx #1 in the outermost holes on the top and bottom. Rotate the door 180 degrees, align the hinge over xxxx #1, and slide/seat it into position. Reinstall xxxx #2 on the top and bottom. Tighten both screws and install the hinge cover.
Remember to align and adjust the door (following the door alignment and adjustment procedure) after reversing the door.
For more detailed instructions and illustrations, refer to the U-LINE UHBD524-IG01A 24 Inch Dual Zone Beverage Center User Guide.
Add New Comment