Answer

Apr 09, 2025 - 01:37 AM
To mount the Eaton Green Motion Fleet EV charger to a wall, follow these steps:
1. Use the adapter plate provided as a template and mark the hole pattern on the wall. Make sure two of the mounting holes are on a stud.
2. Use the four M6 screws provided to mount the adapter plate to the wall.
3. Hang the EV charger on the adapter plate and secure it with the bolts provided.
4. Mount a junction box within 20 inches of the EV charger.
5. Feed the lineside conductors from the EV charger through a 1" trade size conduit and insert them into the junction box.
6. Run conductors from the circuit breaker to the junction box and connect them inside the junction box using the Polaris lugs provided.
7. Mount the premium cord holster using the steel hex head screws provided.
8. Reconnect power to the upstream circuit by switching the circuit breaker to the ON position.
Please note that these instructions are a summary and it is important to refer to the Eaton Green Motion Fleet Installation Guide for detailed and specific instructions.
Add New Comment