Answer

Apr 08, 2025 - 07:58 AM
To install the GIBRALTAR 11419 Galvanized Eave Drip Flashing, follow these steps:
1. Begin installation along the eaves, starting at the corner and working your way around. Make sure to overlap each succeeding piece of drip edge by 2-3 inches.
2. After the eave drip edge has been installed, apply the underlayment and/or ice-water barrier according to your local building codes and weather conditions.
3. Once the underlayment has been installed, apply the drip edge to the rakes. This can be done by wrapping the rake edge around the eave metal to create box corners.
4. Depending on your local building codes and wind conditions, it is recommended to secure the roof edge every 4 to 24 inches.
Please note the following precautions while installing the GIBRALTAR 11419 Galvanized Eave Drip Flashing:
- Working above grade can be dangerous, so ensure that proper fall protection measures are in place.
- When working with power tools, always wear eye protection to prevent any potential injuries.
For more detailed instructions and illustrations, please refer to the installation guide provided with the product.
Add New Comment