Answer

Mar 26, 2025 - 12:30 PM
To install the SeeLess SLA-1G-2G-3G-4G In-Wall Plaster, follow these steps:
1. Rough-In Installation:
- Ensure the power is cut off before starting the installation.
- Center the electrical box and adjust the SeeLess black perforated aluminum brackets to the desired line (1/2", 5/8", or 3/4").
- Use Caddy bars (not supplied by SeeLess) for easy mounting between studs.
- Verify that the studs are level, ensuring the platform is leveled with the drywall.
- Use flat-headed screws to secure the SeeLess brackets (pre-drill for rounded screws) and avoid over-screwing to prevent cracking the gypsum.
2. Post-Install Drywall Installation:
- Cut the drywall around the platform in the desired location.
- Level the drywall with the lower line of the joint on the front of the gypsum platform.
- Adjust the SeeLess black perforated aluminum brackets to the desired line.
- Insert the SeeLess platform at an angle and level the drywall with the lower line of the joint on the front of the gypsum platform.
- Secure the SeeLess platform using flat-headed drywall screws.
- Cover the inside of the platform with paper or tape to protect the center opening.
- Apply fiberglass tape on all four joints around the platform and patch with drywall compound.
- Sand the surface smooth and apply one coat of primer. Wait for it to dry.
- Apply two coats of paint, including the inside of the opening.
- Finally, install the device.
Please note that telescopic (retractable) caddy brackets, drywall screws, and other materials like Caddy bars are not included with the SeeLess SLA-1G-2G-3G-4G In-Wall Plaster.
Add New Comment