Answer

Mar 26, 2025 - 05:22 AM
Installation of the Paulmann 789 Series SimpLED Strip Sada is relatively straightforward. Here are the steps to follow:
1. Start by unpacking the contents of the box and ensure that you have all the necessary tools and components.
2. Determine the desired location for the LED strip and clean the surface where it will be installed. Make sure the surface is dry and free from any dust or debris.
3. For the 789.53 model (1.5m), simply peel off the adhesive backing on the strip and firmly press it onto the desired surface.
4. For the 789.72 (5m), 789.73_76 (7.5m), and 789.74_77 (10m) models, you may need to cut the strip to the desired length. Cut marks are usually indicated on the strip. Use sharp scissors or a cutting tool to make the cut.
5. Connect the LED strip to the corresponding driver. The 789.53 model requires a Bdriver 6VA, while the 789.72_75 and 789.73_76 models require a driver 18VA and driver 24VA, respectively. The 789.74_77 models also require a driver 24VA.
6. Connect the driver to a suitable power source. Ensure that the power is switched off before making any electrical connections. Follow the wiring instructions provided in the manual to connect the driver correctly.
7. Once all the connections are made, switch on the power and test the LED strip to ensure it is functioning properly.
Please note that the replaceability of the light source or operating device depends on the specific model. Refer to the information provided in the manual to determine if these components can be replaced by end users or require the assistance of a qualified electrician.
For any additional information or troubleshooting, please refer to the detailed instruction manual included with the product.
Add New Comment