Answer

Mar 25, 2025 - 09:19 AM
To assemble the FOAMit SP-5N 5 Gallon Air Operated Portable Spray Equipment, follow these steps:
1. Tank Assembly: Attach the tank handle (TANK-5N-HNDL) to the tank (TANK-5N) using the provided HDPE tab (PTAB-5N). Make sure the handle is securely fastened to the tank.
2. Spray Gun Assembly: Connect the discharge hose (H38-30) to the spray gun (PSG12) by screwing it onto the gun's threaded connection. Ensure it is tightened securely.
3. Discharge Hose Assembly: Attach the other end of the discharge hose (H38-30) to the tank's outlet fitting.
4. Optional Components: If you have any optional components, such as a gauge (AG100) or air hose (AH30), follow the manufacturer's instructions to install them.
Please refer to the FOAMit SP-5N 5 Gallon Air Operated Portable Spray Equipment User Manual for detailed diagrams and instructions on the assembly process.
Add New Comment