Answer

Mar 22, 2025 - 12:17 AM
To install the DYE DSR Mech Frame Kit on your paintball marker, please follow these steps:
1. Remove the existing frame: Start by removing the front grip to expose the front mounting xxxx . Then, remove the bolt kit to expose the rear mounting xxxx . Use a 3/32" Allen wrench to remove both front and rear mounting screws. The DSR+ utilizes a positive force connector, so there are no wires to disconnect when removing the frame from the body.
2. Remove the solenoid: Carefully unplug the solenoid wire from the transfer board at the front of the gun. Do not pull on the wires to disconnect. Use a 5/64" Allen wrench to remove the 4 screws securing the solenoid to the body.
3. Install the solenoid mounting studs: The solenoid mounting studs are designed to be used with both the Mech solenoid and Stock electric solenoid. Always use the mounting studs with the solenoid spacer ring. Ensure that the threads on the underside of the body are clean and free of debris. Using fingers only, install the mounting studs in the designated holes.
4. Transfer the Hyper 6™ to the new frame: Remove the sticky grip panels. Using a 3/32" Allen wrench, unscrew and remove the 2 screws retaining the Hyper 6™ assembly. Pull down to remove it from the frame. Install the Hyper 6™ assembly on the new frame using the reverse of the steps above.
5. Install the new frame: Take care to align the holes in the top of the new solenoid with the mounting studs on the body. Make sure the spacer ring is on the solenoid body and that the solenoid gasket is fully seated. Push the frame into place and install the frame mounting screws removed in Step 1. Reinstall the sticky grip panels and the front grip.
Please note that these instructions are a summary of the installation process. For more detailed information and illustrations, please refer to the DYE DSR Mech Frame Kit User Manual.
Add New Comment