Answer

Mar 21, 2025 - 11:50 PM
To install the WINDOWDRIVES ZUV2-24 V DC Secondary Locking Device ZWV on your inward opening window, please follow the instructions provided in the manual. Here is a step-by-step guide:
1. Mount the actuators in the retracted position. Ensure that the actuator and bracket are securely attached. After adjustment, secure the eyebolt.
2. Make sure the window is tightly fastened in the "CLOSED" position.
3. For inward opening windows, the window needs to be secured against falling by a safety catch provided by the window manufacturer.
4. Pay attention to the power line length to the next distributor box and follow the cable diameter requirements.
5. Refer to the enclosed wiring diagram when connecting the motors. Use the appropriate instructions for the motors, tandem power cut-off or parallel power cut-off controls, and control panels in use.
6. Thoroughly check all connections and lines before proceeding.
7. Trigger the "OPEN" signal on the control panel. The actuators should move in the "OPEN" running direction. If any individual motors have incorrect running direction, reverse the polarity of the power lines to correct it.
8. After several trial runs, double-check the secure positioning of the motors and attachment screws.
Please note that the installation process may vary depending on the specific configuration of your window and the additional locking device. It is recommended to consult with a trained, qualified, and safety-conscious electrician or skilled staff with knowledge of electrical equipment installation for professional assembly and installation.
For more detailed instructions and safety precautions, please refer to the WINDOWDRIVES ZUV2-24 V DC Secondary Locking Device ZWV Instruction Manual.
Add New Comment