Answer

Mar 21, 2025 - 12:03 PM
To install the Dainolite MGL-94FH 4 Light Incandescent Chandelier, please follow the steps outlined below:
1. Ensure that the power to the installation area is turned off at the circuit breaker before beginning the installation process.
2. Carefully unpack the chandelier and verify that all the necessary parts are included. If any parts are missing or broken, please contact the factory directly via email at dainolite@dainolite.ca. They will ship the missing or broken parts to you promptly.
3. Determine the desired location for the chandelier and mark the spot on the ceiling where the mounting bracket will be installed. Ensure that the location is suitable for supporting the weight of the chandelier.
4. Attach the mounting bracket to the ceiling using the provided screws and anchors. Make sure the bracket is securely fastened.
5. Connect the chandelier wires to the electrical supply wires in the ceiling. Follow the color-coded instructions in the manual for proper wiring. It is recommended to consult a qualified electrician if you are unsure about the wiring process.
6. Carefully lift the chandelier and hang it onto the mounting bracket. Ensure that it is securely attached.
7. Install the light bulbs into the chandelier sockets. Use the recommended wattage and type of incandescent bulbs as specified in the manual.
8. Once the chandelier is installed, turn on the power at the circuit breaker and test the lights to ensure they are functioning properly.
Please note that this is a general overview of the installation process. For more detailed instructions and safety precautions, refer to the Dainolite MGL-94FH 4 Light Incandescent Chandelier Installation Guide provided with the product.
Add New Comment