To install the Soluna 6K Pack HV (L-E) Solar Storage System, please follow the instructions provided in the user manual. Here are the general steps:
1. Familiarize yourself with the safety precautions and warnings mentioned in the manual.
2. Ensure that you have the necessary tools and installation materials.
3. Choose a suitable installation location that meets the specified conditions, such as a flat and level floor, away from flammable materials, and within the recommended temperature range.
4. Unpack the package and inspect the battery pack for any damage.
5. Prepare the installation area by drilling eight holes on the wall to fix the racks of the battery module.
6. Wear the necessary safety gear before starting the installation.
7. Connect the battery pack to the inverter using the provided communication and battery cables.
8. Turn on the breaker located on the right side of the Soluna 6K Pack HV (L-E).
9. Set the depth of discharge (DOD) on your inverter according to the recommended values (80% for on-grid and 70% for off-grid).
10. If using the Wi-Fi module, connect it to the CAN2 port of the battery module.
11. Once the system is powered on, select the battery communication protocol on the inverter for the system to run normally.