Answer

Mar 20, 2025 - 03:05 AM
To install the HILTI S-BT-GF M8-7 AN 6 xxxx -in Threaded Studs & Standoffs, please follow the instructions below:
1. Preparation:
- Ensure that you have the necessary tools and equipment for installation, including a power drill, appropriate drill bits, and a torque wrench.
- Review the structural steel or aluminum member's specifications and requirements for the installation of threaded studs.
- Ensure that the surface where the studs will be installed is clean and free from any debris or contaminants.
2. Marking and Drilling:
- Mark the desired locations on the structural steel or aluminum member where the threaded studs will be installed.
- Use an appropriate drill bit to create holes at the marked locations. The diameter of the holes should match the diameter of the threaded studs.
3. Installation:
- Insert the threaded stud into the drilled hole and ensure it is aligned properly.
- Use a torque wrench to tighten the threaded stud to the recommended torque value specified in the product manual or the structural steel or aluminum member's specifications.
- Repeat the above steps for each threaded stud that needs to be installed.
4. Verification:
- After installation, visually inspect each threaded stud to ensure it is securely fastened and properly aligned.
- Check the structural steel or aluminum member's specifications to verify that the installation meets the required standards.
Please note that the above instructions are a general guideline. For specific installation details and requirements, refer to the HILTI S-BT-GF M8-7 AN 6 xxxx -in Threaded Studs & Standoffs Instruction Manual provided with the product.
Source: https://manuals.plus/hilti/s-bt-gf-m8... xxxx -in-threaded-studs-standoffs-manual
Add New Comment