Answer

Mar 18, 2025 - 03:41 AM
To install the BubblyNet G4 plus G7 Touchscreen, please follow these steps:
1. Use an appropriate cutting tool to make a cutout in the wall according to the dimensions provided in the cutout table. The cutout can be in landscape or portrait mode. Make sure to pull out the USB-C and Ethernet cables through the cutout.
2. Connect the USB-C and Ethernet cables to the touchscreen. The USB-C cable is necessary for power and operation, while the Ethernet cable is optional but recommended.
3. Pull the springs back to prepare for installation.
4. Insert the touchscreen into the wall, ensuring that all cables are inside the wall.
5. Flip on the breaker to the screen. The touchscreen will automatically start the setup routine.
Please note that the installation of the BubblyNet G4 plus G7 Touchscreen should be done by a qualified electrician, in accordance with the National Electrical Code, local, and federal specifications. Disconnect power at the electrical panel before servicing.
For further information and specifications, please refer to the provided manual.
Add New Comment