Answer

Mar 17, 2025 - 02:25 AM
To assemble and operate the FOAMit MU-10N-2 10 Gallon Fog Unit with 2 Nozzles, follow these steps:
1. Ensure that you have read and understood the user manual completely before operating or servicing the unit. Also, wear appropriate personal protective equipment (PPE) when operating or servicing the unit.
2. Fill the tank with the desired amount of product.
3. Place the unit in the area to be misted.
4. Ensure that the air supply valve (BVB14) is in the closed position, and connect a compressed air line to the air inlet fitting (AP25).
5. Open the air supply valve (BVB14) to activate the unit.
6. Evacuate the area.
7. After the unit has stopped misting, observe all appropriate safety precautions before reentering the area. Close the air supply valve (BVB14) and disconnect the compressed air line from the unit.
Please refer to the user manual for more detailed instructions and safety precautions.
Add New Comment