Answer

Mar 14, 2025 - 02:38 AM
To install the optional visor kit for the RICE LAKE LaserLight3 Series Remote Display, please follow these steps:
1. Unplug the LaserLight3 from the power source.
2. If necessary, remove the LaserLight3 from the mounted surface.
3. Remove the six mounting screws with flat washers and lock washers that secure the standard mounting bracket or VESA mount to the LaserLight3. Keep these screws for reuse.
4. Remove the mounting bracket from the LaserLight3.
5. Align the visor and mounting bracket with the mounting holes on the back of the LaserLight3.
6. Secure each mounting hole with the previously removed hardware (from Step 3).
7. Torque the six mounting screws to 20-30 in-lb (2.26-3.39 N-m).
Please note that the LaserLight3 does not have a power switch, so it is important to ensure that the power cord is disconnected from the power outlet before working with the unit.
For more detailed information and illustrations, you can refer to the RICE LAKE LaserLight3 Series Remote Display Installation Guide provided by Rice Lake Weighing Systems. Additionally, if you have any further questions or need assistance, you can contact Rice Lake Weighing Systems directly through their website at www.ricelake.com.
Add New Comment