Answer

Mar 13, 2025 - 03:00 AM
To prepare for the installation of the welldana 61-092005 Comfortana Spa 139 x 139 Med Front, you will need to ensure that you have the necessary water supply, power supply, and drainage pipe in the installation position. The water pressure should be between 0.2 - 0.6Mpa, and the water supply should be connected to a G1/2" hose xxxx connection for cool and warm water. The drainage pipe should have a diameter of 1 1/2" (40mm). Please refer to the water and electrical installation diagrams provided in the user manual for more specific details. Additionally, make sure you have the following tools ready before installation: a cross screwdriver, a straight screwdriver, a level, and a spanner.
Add New Comment