Answer

Mar 11, 2025 - 02:18 AM
To install the RAB T8-24-96G-FA8-8XX-DE-BYP Double Ended Direct Wire Single Pin T8 LED, please follow these steps:
1. Switch off the power supply before starting the installation.
2. Ensure that the fixture is suitable for use with the LED tube and that the input rating of the retrofit kit does not exceed the input rating of the luminaire.
3. Proper grounding is required for safety. Make sure the product is installed in accordance with the applicable installation code by a person familiar with the construction and operation of the product and the hazards involved.
4. The ballast wiring represents a typical configuration, but the actual ballast wiring may vary according to the ballast model. It is not necessary to change the socket if it is in good condition.
5. Connect one side of the fixture to Live (L) and the other side to Neutral (N).
6. If dimming is desired, refer to the wiring diagram 'Dimmable via an external accessory' in the definition of DLC V5.1. Please note that this lamp may not be compatible with all dimmers, so it is recommended to contact RAB Lighting for more information.
7. After installation, switch on the power supply and test the LED tube to ensure it is functioning properly.
Please note that these instructions are a general guide and may not cover all details or variations in equipment. It is important to consult the product manual for specific instructions and to comply with all applicable codes and regulations.
Add New Comment