Before installing the VENEZIA LB180 Woodbridge Whirlpool Tub and Air Bathtub, it is important to prepare the plumbing according to the rough-in dimensions. This includes positioning the plumbing and capping the supplies to check for leaks. It is crucial to ensure a watertight seal on the bath drain connections. Install the faucet valves and shower head tee, making sure to provide sufficient clearance when drilling the bathtub for a faucet. Open the hot and cold water valves and check the supply connections for leaks. Run water into the bath and check the drain connection for leaks. Fill the bathtub up to the overflow level and check the overflow unit for leaks.
Please note that these are general guidelines, and it is recommended to refer to the specific instructions provided in the installation guide for the VENEZIA LB180 Woodbridge Whirlpool Tub and Air Bathtub for detailed and accurate information.