To install the Felicitysolar LPBF48250 LiFePO4 Battery System for Households, please follow these steps:
1. Unpacking and Inspection:
- Before installation, inspect the unit to ensure nothing inside the package is damaged.
- Check that you have received all the items listed in the package.
2. Mounting the Unit:
- Do not mount the battery on flammable construction materials.
- The ambient temperature should be between 0°C and 45°C for optimal operation.
- The recommended installation position is to adhere the battery to the wall vertically.
- Ensure sufficient heat dissipation and enough space for removing wires.
3. Battery Connection:
- Assemble battery ring terminals based on the recommended battery cable and terminal size.
- Connect all battery packs as required. It is suggested to connect at least 2 sets of LPBF48V for inverters larger than 6KVA in parallel connection.
4. Connection for Parallel Mode:
- The LPBF series battery supports parallel connection for expansion.
- If you need one more battery bank to work in parallel mode, follow the connection diagram provided in the manual.
Please refer to the manual for detailed illustrations and diagrams that accompany these installation steps.