Answer

Mar 05, 2025 - 11:08 PM
To install the , please follow these steps:
1. Unpack and inspect the unit to ensure nothing is damaged.
2. Select a suitable location for installation, ensuring it is not mounted on flammable materials and the ambient temperature is between 0°C and 45°C.
3. Mount the battery system vertically on the wall, following the recommended installation position.
4. Ensure there is enough space for heat dissipation and wire removal.
5. Assemble the battery ring terminal based on the recommended battery cable and terminal size.
6. Connect all battery packs as required. It is recommended to connect at least 2 sets of LPBF48V in parallel for inverters larger than 7.5KVA.
7. If you need the battery to wake up when the grid is back, connect the battery with the grid using a power adapter and communication line as shown in the package list.
8. If you need to connect the battery in parallel mode, follow the schematic diagrams provided in the manual.
9. For a pure off-grid system with solar panels, connect the PV awake wire with an MPPT charge controller.
Please refer to the manual for detailed illustrations and diagrams of the installation process.