Answer

Mar 05, 2025 - 07:32 PM
To install the COOKOLOGY CEI1100BK Ceiling Extractor Cooker Hood, follow these steps:
1. Before installation, turn off the unit and unplug it from the outlet.
2. The cooker hood should be placed at a distance of no more than 150cm from the cooking surface for optimal performance.
3. Ensure that the ceiling can bear at least 120KGs weight and that the thickness of the ceiling is ≥30MM.
4. Drill 14pcs φ8mm holes on the ceiling according to the size shown in the manual. Use 14pcs explode screws or 14pcs of ST6*40mm big flat screws+14pcs wall plugs to fix the two hanging boards on the ceiling.
5. Calculate the length of the angle iron and use 32pcs of M4*10 screws and M4 nut with gasket to connect the angle iron into the adjustable angle iron bracket.
6. Choose the direction of the outlet (①/②/③/④) by unscrewing the 8pcs machine silk from the cabinet housing and rotating it by 90°/180°/270°. Then, xxxx the 8pcs machine silk to fix the housing well and install the expansion pipe to the outlet.
7. Connect the 4 adjustable angle iron brackets with the housing using 8pcs M4*12mm machine silk screws. Lift up the housing and use 8pcs M4*12mm machine silk screws and M4 nut with gasket to fix the housing onto the 2 hanging boards. Make sure to pull the expansion pipe outside and firmly fix it on the housing.
8. After installing the housing to the hanging boards, use a cross screwdriver or straight screwdriver to adjust the xxxx of the angle iron bracket to level the housing position and height. Use the cross screwdriver to tighten the safety xxxx after achieving the desired level position and height.
Note: It is important to read the entire installation section in the manual for detailed instructions and illustrations.
Please refer to the COOKOLOGY CEI1100BK Ceiling Extractor Cooker Hood Instruction Manual for more information and specific details on installation.