Answer

Mar 05, 2025 - 02:10 AM
To install the Lectron Energy Meter, follow these steps:
1. Connect the ground wire from your electrical panel to the V-BOX Charging Station.
2. Insert the neutral wire from the electrical panel into the no. 1 port at the top of the energy meter. Use a Phillips screwdriver to tighten the xxxx .
3. Insert the neutral wire from the V-BOX Charging Station into the no. 4 port at the bottom of the energy meter. Tighten the xxxx .
4. Insert the live wire from the electrical panel into the no. 2 port at the top of the energy meter. Tighten the xxxx and close the compartment.
5. Insert the live wire from the V-BOX Charging Station into the no. 3 port at the bottom of the energy meter. Tighten the xxxx and close the compartment.
Add New Comment