To install the QAZQA Mosh SL Spot the Ceiling Light, please follow the instructions provided in the manual. Here is a step-by-step guide:
1. Before starting the installation, ensure that the electrical supply is switched off. It is recommended to switch off the power from the distribution box.
2. The installation of the luminaire should be carried out by authorized and qualified technicians in accordance with the valid regulations for electrical installation.
3. Take note of the minimum separation distance from other objects and the required room around the fitting. This will ensure proper ventilation and prevent any potential hazards.
4. If you are unsure about the installation process, it is advisable to consult a professional, considering the local installation requirements. Some countries may require lighting installations to be done only by registered installers.
5. Make sure to adequately tighten the clamping screws in electrical connections, especially for 12V low voltage conductors.
6. Once the luminaire is installed, it is important to perform regular maintenance limited to the surfaces. Avoid any moisture coming into contact with the terminal connections or voltage control parts during maintenance.
7. Clean the luminaire using a clean, dry cloth or brush. Do not use solvents or abrasives. Avoid dampness on all electrical components.
8. Take into account all available technical information provided in the manual.
Please remember to keep the user manual for future reference and safety instructions.
If you have any specific questions or concerns regarding the installation process, please refer to the QAZQA Mosh SL Spot the Ceiling Light Instruction Manual for detailed instructions and diagrams.