To install the Landis Gyr ULTRAHEAT T150 Ultrasonic Flow Meter, follow these steps:
1. Check if there is sufficient space available for the flow meter.
2. Rinse the system thoroughly before installing the flow meter.
3. Fit the flow meter vertically or horizontally between two slide valves, ensuring that the arrow on the housing matches the flow direction.
4. Seal the fittings to protect against manipulation.
5. Loosen the elastic band or cable tie provided for transport from the volume measurement unit. The control cable should not depend directly on the volume measurement unit during operation.
6. If installing the flow meter for cold metering, follow the appropriate notes.
7. If installing multiple flow meters in one unit, ensure they operate under the same mounting conditions.
Note: It is important to adhere to the locally applicable installation regulations for flow meters.
For more detailed installation instructions and diagrams, please refer to the Landis Gyr ULTRAHEAT T150 Ultrasonic Flow Meter User Manual.