Answer

Mar 01, 2025 - 05:49 AM
To assemble the SEALEY ES900F.V2 Folding Engine Stand 900KG, please follow the instructions provided in the manual:
1. Bolt the large castor wheels (9) to the rear-most mountings on the main frame and to the legs using M8x20 bolts (4), M8 washers (3), M8 lock washers (2), and M8 nuts (1). Bolt the small castor wheels (14) to the forward mountings on the main frame using M8x14 bolts (10), M8 washers (3), M8 lock washers (2), and M8 nuts (1).
2. Assemble the legs (21) to the frame using the Ø16x110 pins (11). Lay each leg into the open channel and insert the first pin into the hole nearest the rear of the frame. This will be the folding leg pivot. Retain the pin with an 'R' clip (15). Lock the leg in the down position by inserting a second Ø16x110 pin (11) into the hole nearest the open end of the channel and retain it with an 'R' clip (15).
3. Bolt the main post (19) to the cross member between the open channels using two M14x100mm bolts (8), M14 washers (7), M14 lock washers (6), and M14 nuts (5). Do not fully tighten the nuts at this stage.
4. Take the two support struts (18) and loosely bolt them to the top of the main post (19) using an M14x100 bolt (8). Insert two M14x100 bolts (8) through the angled parts of the main base in the holes adjacent to the rear square section, ensuring that the bolt heads are on the outside of the frame.
5. Slide the bottom of each support strut (18) over the end of each bolt in turn and secure them with the nut (5) and washers (6) and (7). Fully tighten all the nuts and bolts holding the main post and struts.
6. Take the engine mounting arm (17) and insert it through the tube at the top of the main post (19). Rotate the plate until one of the holes in the inner tube is aligned with a hole in the outer tube and insert the locking pin (13).
7. Take the handle (16) and insert it into the hole in the part of the turning plate tube protruding through the top of the main post (19). Attach the adjustable mountings (17) to the turning plate using M14x60 bolts (12), M14 washers (7), M14 spring washers (6), and M14 nuts (5).
8. To fold up the legs (21), remove the 'R' clips (15) from the Ø16x110 pins (11) furthest from the rear of the frame and pull out the pins. Fold the legs up. Always retain the legs in the upright position by re-inserting the pins (11) through the holes in the frame directly in front of the folded legs. Retain the pins (11) with the 'R' clips (15).
Please refer to the manual for any additional information or clarification.
Add New Comment