Answer

Mar 01, 2025 - 05:45 AM
Installation of the ZCG UAM90L Right Angle Heavy Duty Clamp Bracket involves the following steps:
1. Start by gathering all the supplied parts mentioned in the manual:
- Vee Cross Welded Assembly, MS, Galvanised (Quantity: 6)
- Washer, Flat, Galvanised, M10 (Quantity: 4)
- Washer, Spring, Galvanised, M10 (Quantity: 4)
- Nut, Hex, Galvanised, M10 (Quantity: 4)
- Bolt, MS, Hex, Galvanised, M10x75mm (Quantity: 4)
- Clamp Bar, MS, Galvanised (Quantity: 2)
2. Position the Vee Cross Welded Assembly on the desired mounting surface, ensuring it is aligned correctly.
3. Use the M10x75mm bolts to secure the Vee Cross Welded Assembly to the mounting surface. Insert the bolts through the holes in the Vee Cross Welded Assembly and tighten them using the provided nuts and washers. Make sure to use the flat washers between the nuts and the Vee Cross Welded Assembly and the spring washers between the nuts and the flat washers for added security.
4. Repeat the above step for all six Vee Cross Welded Assemblies, ensuring they are evenly spaced and aligned properly.
5. Once all the Vee Cross Welded Assemblies are securely mounted, take the Clamp Bars and position them over the Vee Cross Welded Assemblies, ensuring they are aligned correctly.
6. Use the M10x75mm bolts to secure the Clamp Bars to the Vee Cross Welded Assemblies. Insert the bolts through the holes in the Clamp Bars and tighten them using the provided nuts and washers. Again, use the flat washers between the nuts and the Clamp Bars and the spring washers between the nuts and the flat washers for added security.
7. Ensure all bolts, nuts, and washers are tightened properly to ensure a secure installation.
Please note that the above instructions are a general guide based on the information provided in the manual. It is always recommended to refer to the specific installation guide provided by the manufacturer for detailed and accurate instructions.