Answer

Feb 28, 2025 - 11:15 PM
To install the Leonton PG2-1204-SFP Industrial Gigabit PoE+ Ethernet Switch, follow these steps:
1. Unpack the switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the switch. If not, refer to the DIN-Rail Mounting section for installation instructions.
3. If you want to wall mount the switch, refer to the Wall Mounting section for installation instructions.
4. Hang the switch on a DIN-Rail or wall according to the Mounting Installation section.
5. Power on the switch and check if the power LED light turns on. If you need help with wiring the power inputs, refer to the Wiring the Power Inputs section.
6. Prepare a twisted-pair, straight-through category 5 cable for Ethernet connection.
7. Insert one side of the RJ-45 cable into the switch's Ethernet port and the other side into the networking device's Ethernet port.
8. Insert one side of the SFP cable into the switch's SFP port and the other side into the networking device's SFP port.
9. Check if all LED indicators show normal status.
10. Once all connections are set and the LED lights are normal, the installation is complete.
Please refer to the provided user manual for detailed illustrations and additional information on the installation process.
Add New Comment