Answer

Feb 28, 2025 - 11:12 PM
To install the Leonton EG2-1002-SFP industrial gigabit Ethernet switch, follow these steps:
1. Unpack the switch from the original packing box.
2. Check if the DIN-Rail bracket is already screwed onto the switch. If not, refer to the DIN-Rail Mounting section in the manual for instructions on how to install the DIN-Rail.
3. If you want to wall mount the switch, refer to the Wall Mounting section in the manual for instructions on how to install the wall mounting brackets.
4. Once the switch is mounted, power it on. The power LED light will turn on to indicate that the switch is receiving power.
5. Prepare a twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one end of the RJ-45 cable into the switch's Ethernet port and the other end into the networking device's Ethernet port (e.g., switch, PC, or server). The Ethernet port's LED on the switch will turn on when the cable is connected.
7. If you are using SFP ports, insert one end of the SFP cable into the switch's SFP port and the other end into the networking device's SFP port (e.g., switch or server). The SFP port's LED on the switch will turn on when the cable is connected.
8. Once all connections are made and the LED lights indicate normal operation, the installation is complete.
Note: If you encounter any issues during installation or operation, refer to the Troubleshooting section in the manual for assistance. If the problem persists, contact Leonton Technologies for technical support.
Add New Comment