Answer

Feb 28, 2025 - 11:05 AM
To install the Leonton PT2-1002-2C-24 Industrial PoE+ Ethernet Switch, follow these steps:
1. Unpack the switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the switch. If not, refer to the DIN-Rail Mounting section in the manual for installation instructions.
3. If you want to wall mount the switch, refer to the Wall Mounting section in the manual for installation instructions.
4. Power on the switch and ensure that the power LED light turns on. If you need help with wiring the power inputs, refer to the Wiring the Power Inputs section in the manual.
5. Prepare a twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one side of the RJ-45 cable into the switch's Ethernet port and the other side into the networking device's Ethernet port (e.g., switch, PC, or server). The Ethernet port's LED on the switch will turn on when the cable is connected.
7. If you have an SFP cable, insert one side into the switch's SFP port and the other side into the networking device's SFP port (e.g., switch or server). The SFP port's LED on the switch will turn on when the cable is connected.
8. Once all connections are set and the LED lights show normal operation, the installation is complete.
For more detailed instructions and illustrations, please refer to the Hardware Installation section in the Leonton PT2-1002-2C-24 User Manual.