Answer

Feb 28, 2025 - 03:47 AM
Sure, I can help you with the installation process of the EMTEK F20 UL Listed Mortise Lock. Here are the steps you need to follow:
1. Install Cylinder Plug:
- Thread the cylinder plug clockwise onto the lock body.
- Make sure that the notch on the cylinder plug is in the 9 o'clock position when fully screwed onto the lock body.
2. Install Mortise Lock:
- Refer to the provided template for door prep specifications.
3. Install Key Cylinder:
- Insert the key ¾ of the way into the key cylinder.
- Thread the key cylinder clockwise onto the trim plate.
- Note that the plates and grip may vary depending on the style.
4. Tighten Key Cylinder:
- Once the key cylinder is installed, secure it by tightening the xxxx .
5. Mount Inside Trim to Door:
- Attach the inside trim to the door.
6. Install Trim Plate:
- Install the trim plate according to the instructions provided.
7. Tighten Inside Lever or xxxx :
- Use the provided 3/32 Hex wrench to tighten the lever.
8. Install Door Jamb:
- Install the door jamb according to your specific requirements.
9. Passage/Privacy Lock:
- If you need to reverse the swing of the door, follow these steps:
- Remove the dowel xxxx (remember to replace it after reversing the swing).
- Pull out and rotate the latch bolt to reverse its direction.
Please refer to the EMTEK F20 UL Listed Mortise Lock Installation Guide for more detailed instructions and illustrations.
Add New Comment