Answer

Feb 28, 2025 - 02:53 AM
To install the ITC 69728SS Docking Light, follow these steps:
1. Determine the installation location and drill a 1/2" hole for the wire.
2. Drill two mounting holes at 1.4" on center.
3. Wire the light to the incoming 12V DC power using the provided wiring diagrams. It is recommended to add fuse protection to the positive (+) input.
4. Test the light to ensure it is functioning properly.
5. Feed the wires back through the hole and push the light into the mounting holes.
6. Apply application-specific sealant around the light to prevent water ingress.
7. Tighten the nuts on the back of the light to hold it in place.
Make sure to disconnect power before installing or making any changes to the light. Also, account for all parts and destroy all packing materials to avoid hazards to children.
For warranty information, please visit www.itc-us.com/warranty-return-policy or contact ITC directly at 3030 Corporate Grove Dr. Hudsonville, MI 49426, Phone: 616.396.1355.
Please refer to the provided installation guide for more detailed instructions and safety precautions.
Add New Comment