Answer

Feb 27, 2025 - 10:53 PM
To mount the Command Light Traffic Flow Board to the Command Light, follow these steps:
1. Remove the arrow board housing from the Command Light by removing the top four screws (10-24 x 3/8) from the dust cover.
2. Drill out the four holes using a 5/16 drill bit, while leaving the dust cover in place.
3. Attach the four clip-on nuts to the side panel, aligning them with the drilled holes.
4. Place the dust cover back in place, securing it with all screws except for the top four.
5. Position the bottom housing of the Traffic Flow Board on top of the dust cover.
6. Use the ¼-20 x ¾ screws to mount the bottom housing in place.
For a visual representation of the mounting process, you can refer to the "Repair in the Field" section of the user guide, which includes an exploded view diagram.
If you encounter any difficulties during the mounting process, please contact Command Light at 1-800-797-7974 or email info@commandlight.com for further assistance.
Add New Comment