Answer

Feb 27, 2025 - 01:55 AM
Unboxing and setting up the LG 75QND90SQA Smart LED Display is a straightforward process. Here's a step-by-step guide:
1. Unboxing:
- Carefully remove the packaging materials from the box.
- Lift the display out of the box and place it on a flat surface.
2. Installation:
- Attach the stand to the display if it is not already pre-installed. Follow the instructions in the user manual for proper installation.
- If you prefer wall mounting, refer to the user manual for instructions on how to mount the display securely on a wall.
3. Connectivity:
- Connect the power cord to the display and plug it into a power outlet.
- Connect your external devices, such as a cable/satellite box, gaming console, or Blu-ray player, to the display using the available HDMI or other compatible ports. Refer to the user manual for specific instructions on connecting different devices.
4. Power:
- Press the power button located on the display or use the remote control to turn on the display.
- Follow the on-screen prompts to complete the initial setup process, including selecting your preferred language, connecting to a Wi-Fi network, and accepting the terms and conditions.
5. Dimension:
- The dimensions of the LG 75QND90SQA Smart LED Display can be found in the user manual or on the LG website. It is recommended to refer to these sources for accurate and up-to-date information.
For more detailed instructions and troubleshooting tips, please refer to the user guide provided with the product or visit the LG website at www.lg.com.
Add New Comment