Answer

Feb 26, 2025 - 05:42 AM
To install and set up the Little GIANT 18S SERIES Sewage Pump, please follow the steps below:
1. Ensure that the power supply to the pump is disconnected before starting the installation process.
2. Select a suitable location for the pump. It should be placed on a solid, level surface that can support the weight of the pump.
3. Connect the discharge pipe to the 3" FNPT (761 mm) discharge port on the pump. Make sure the pipe is securely fastened to prevent leaks.
4. If required, connect a check valve to the discharge pipe to prevent backflow.
5. Connect the power cord to a suitable power source. The power cord is 14/3, SOW (1-phase) and comes in lengths of either 20' or 40', depending on the model.
6. Ensure that the pump is properly grounded according to local electrical codes.
7. Before starting the pump, ensure that the impeller and volute are free from any obstructions or debris.
8. Once the pump is properly installed and connected, you can turn on the power supply and start the pump.
9. The pump is designed for continuous duty, so it can run continuously without overheating.
10. Regular maintenance is recommended to ensure optimal performance. Refer to the user manual for maintenance instructions.
Please note that the above steps are a general guideline. For specific installation instructions and safety precautions, please refer to the user manual provided with the Little GIANT 18S SERIES Sewage Pump.
Add New Comment