Answer

Feb 26, 2025 - 04:50 AM
To install the Skinner ST Saddle Tee, please follow the steps outlined in the instruction manual:
Step #1: Thoroughly clean the area where the Saddle Tee will be installed using a wire brush. Remove any pipe scale, rust, or foreign material to ensure a proper seal.
Step #2: Position the Saddle Tee in place and tighten the bolt to the recommended torque specified in the table provided in the manual. The torque values are as follows: 60 ft/lb for all sizes.
Step #3: Make the service line connection using the chosen method, such as a drilling device. Follow the appropriate procedures for connecting the service line.
Step #4: After installation, it is important to pressure test the complete installation for leaks. This step ensures that the connection is secure and there are no leaks.
Step #5: Before leaving the repair site, check for any leaks to ensure the installation is successful and there are no issues.
It is important to note that the gasket material used in the Saddle Tee is Buna-N (Nitrile Rubber), which has temperature ratings of -20°F minimum and 250°F maximum. It is crucial not to exceed the temperature or pressure ratings specified.
If you require further assistance or have any additional questions, you can contact The Skinner Company directly at the provided phone number or visit their website for more information.
Add New Comment