Answer

Feb 26, 2025 - 04:48 AM
To install the Leonton PT2-0800-24 8-Port Industrial PoE+ Ethernet Switch, follow these steps:
1. Unpack the switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the switch. If not, refer to the DIN-Rail Mounting section in the manual for installation instructions. If you want to wall mount the switch, refer to the Wall Mounting section.
3. Hang the switch on a DIN-Rail or wall according to the Mounting Installation section.
4. Power on the switch and ensure that the power LED light turns on. Refer to the Wiring the Power Inputs section for help with power wiring.
5. Prepare a twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one end of the RJ-45 cable into the switch's Ethernet port and the other end into the networking device's Ethernet port (e.g., switch, PC, or server). The Ethernet port's LED on the switch will turn on when the cable is connected.
7. Verify that all LED indicators show normal operation. Refer to the LED Indicators section for LED light indications.
8. Once all connections are set and the LED lights are normal, the installation is complete.
Please note that if you encounter any issues or need further assistance, you can contact Leonton Technologies for technical support service. Their contact information is provided in the manual.
Add New Comment