Answer

Feb 26, 2025 - 04:23 AM
To install the RAB NDLED4SD-WY-B-S LED Downlights in a new construction project, follow these steps:
1. Make sure you have access to the ceiling from the top or during the framing stage.
2. Order the New Construction Square Rough-In component along with the Trim Component (silver trim black cone) to make a complete fixture.
3. Install the New Construction Square Rough-In according to the provided instructions.
4. Connect the wiring to the integral junction box of the NDLED fixture. The junction box has wiring capacity for a minimum of 90°C supply conductors, with 4 in and 4 out connections.
5. Use the EZ-Connector for easy installation.
6. If you plan to use a dimming feature, ensure you have a dimming driver compatible with 0-10V, TRIAC, and ELV dimming methods (depending on your voltage).
7. Mount the NDLED fixture using the provided butterfly bracket. It can be mounted with bar stock, "C" channel, 1/2" conduit, or nailer bars.
8. The low-profile design of the fixture allows for installation in ceilings with limited space.
9. The nanostructure lens eliminates "hot spots" and provides smooth and efficient light distribution.
10. Ensure compliance with local construction codes when installing the NDLED in drop ceiling tiles using optional c-channel bars.
11. For any further assistance or technical support, you can contact RAB's tech help line at (888) 722-1000 or email sales@rablighting.com.
Please note that the above information is based on the provided manual and specifications, and it is always recommended to refer to the official owner's manual for detailed installation instructions specific to your project.
Add New Comment