Answer

Feb 26, 2025 - 12:59 AM
To install the BLUE SEA SYSTEMS M2 OLED Digital Monitor, follow these steps:
1. Choose the mounting style and location for the meter.
2. Prepare the mounting hole using the provided cutout templates.
3. Install the provided 500A/50mV shunt according to the wiring diagram.
4. If needed, install a busbar.
5. Make all necessary connections to the meter's connector, following the wiring diagram. Do not insert fuses into fuse holders at this time.
6. Plug the wired connector into the meter.
7. Insert fuses into the fuse holders, making sure to insert the fuse to Pin 2 (DC Supply/Battery 2+) last.
For more detailed information and configurations, refer to the online manual at bluesea.com/products/1830.
Add New Comment