Answer

Feb 25, 2025 - 01:27 AM
To install the CLDMPD6FL 6 Inches Slim Led Light Flush Mount Flood Beam, follow these steps:
1. Determine suitable mounting locations for the LED work lights, wiring harness, and switch. Choose a location that allows for proper illumination and accessibility.
2. Ensure that the mounting surface is flat and can accommodate the light's depth. Make sure there is enough room for the light to fit in.
3. Cut out a hole for the light housing and drill two outside holes for mounting.
4. Connect the wires as illustrated on page 1 of the user manual. Proper insulation at connections is required. Ensure that the positive and negative wires are connected correctly.
5. Press the switch to test if the lights are functioning properly.
For more detailed instructions and illustrations, please refer to the user manual provided with the product.
Add New Comment