Answer

Feb 25, 2025 - 12:54 AM
Installation and commissioning of the AEG VB2 Plus Generator Circuit Breaker should be carried out by professional trained full-time electrical personnel. Here are the steps to install and commission the circuit breaker:
1. Read the user manual carefully and ensure that all installation and usage requirements are met.
2. Before installation, inspect the circuit breaker for any damage or harmful environmental impact. Clean the surface of insulating parts and remove any dirt or contamination.
3. Ensure that the circuit breaker is placed in a suitable location in the switch cabinet, following the specified mounting guidelines. Avoid tension or deformation of the circuit breaker and use appropriate fasteners to secure the connections.
4. If the circuit breaker is of the handcart type, carefully push it into the switch cabinet according to the provided instructions. Make sure the circuit breaker is in the working position or test position smoothly.
5. Connect the main terminal of the circuit breaker, ensuring that there is no permanent tension or pressure on the main terminal.
6. Before commissioning, disconnect all auxiliary power supplies and ensure there is no danger of power transmission. The circuit breaker should be in the open state and the spring should not be storing energy.
7. Perform a manual operation test to ensure that the circuit breaker can close and open properly.
8. Once the circuit breaker is installed and tested, it can be commissioned for operation. Follow the specified operating sequence and ensure that all interlocking mechanisms are functioning correctly.
Please note that this is a general overview of the installation and commissioning process. For more detailed instructions and specific guidelines, refer to the AEG VB2 Plus Generator Circuit Breaker User Manual provided.