Answer

Feb 24, 2025 - 07:38 AM
To install the Lithionics Battery GTX12V630A NeverDie Compact Series 200 Internal BMS, follow these steps:
1. Ensure that all electrical work is performed in accordance with local and national electrical codes.
2. Use insulated tools and gloves while working on the system to protect against voltage present at the battery terminals.
3. Before performing any repairs, maintenance, or diagnosis on the system, turn off the equipment connected to the battery and turn off the Power button on the battery to isolate it from other electrical circuits.
4. Use proper wire sizes to connect the system to inverters, chargers, or other equipment.
5. Use crimped connections to connect to the battery terminals.
6. Read and follow the safety precautions provided by the inverter, charger, or other equipment manufacturers before connecting the battery.
7. Use charging equipment compatible with Lithium Iron Phosphate battery chemistry.
For detailed instructions on system installation, refer to the Lithionics Battery GTX12V630A NeverDie Compact Series 200 Internal BMS Instruction Manual.
Add New Comment