Answer

Feb 24, 2025 - 07:07 AM
Installation:
1. Ensure that the product is not damaged. If it is, do not proceed with the installation and return it for replacement.
2. Adhere to the safety warnings mentioned in the manual.
3. Use a flatblade screwdriver to release the two end covers of the controller.
4. Mount the driver and wire it according to the wiring diagram provided in the manual.
5. Replace the end covers to ensure adequate strain relief.
Note: The blind must have an appropriate MCB (Miniature Circuit Breaker) to protect the load circuit.
Calibration:
After the installation, follow the calibration procedure to configure the zc-smart-blind to work with the blind motor correctly:
1. Send the "off" command.
2. Wait for the blind to be completely closed.
3. Send the "recall max" command.
4. Wait for the blind to be completely open.
5. Repeat steps 1-4.
Note: Before starting the calibration, make sure to set the limit settings on the blind motor according to the specific manufacturer's instructions.
For more information and details on compliant software, please visit the zencontrol website at zencontrol.com.
Add New Comment